
Waterproofing is the part of a bathroom you never see and the part that costs the most to get wrong. Membranes are installed to AS 3740 and the work is documented, so the paperwork exists if you ever sell the house.
Older homes on the peninsula often still have their original membrane and no screed fall. That is worth knowing before anything is tiled over.
On the drawing board.
Where a shower wall meets the shower floor, and what is under the tile.
- The frame. Checked once the old tiles are off. Rot or an out-of-level floor is fixed under the same licence.
- Wall sheet. Fixed to a sound, straight frame.
- Membrane. To AS 3740, up the wall and across the floor, and documented.
- The junction. Where wall meets floor: sealed so the membrane can move without tearing.
- Screed laid to fall. So water runs to the waste and nowhere else.
- Floor waste. Its flange is part of the membrane, not an afterthought.
- Tile. Set out before the first one goes on.
Asked about waterproofing.
What happens about waterproofing?
Membranes are installed to AS 3740, the Australian Standard for wet areas, and the work is documented, so the paperwork exists if you ever sell the house. Waterproofing is the part of a bathroom you never see and the most expensive part to get wrong.
What if you find something unexpected once the tiles come off?
It happens: rotten framing, floors out of level, plumbing in the wrong place. Because Mitch is a licensed builder, structural work stays his responsibility instead of becoming a dispute between trades. Anything found gets explained and priced before it goes ahead.


